如何手动创建SAP S/4HANA的生产订单
A production order specifies which material is to be produced, where it is to be produced, which operations are required to do this and on which date production is to take place. It also defines how the order costs are to be settled. 也負責決定訂單的費用如何決定。
S/4HANA的生產訂單既可以手動生成,也可以基于一個planning order自動生成。
As described in this procedure, production orders can be created manually without being previously requested. Alternatively, they can be automatically created by converting a planned order. During requirements planning (MRP run), planned orders are created at every BOM level to cover requirements.
在需求計劃階段(即MRP run階段),planned order在BOM級別被創建,負責承擔費用。
事務碼CO01:
維護必填字段Material,即待生產的物料
生產工廠ID: 2800
Order Type PP04:
敲回車,進入明細頁面,此時觀察到已經生成了一個缺省的Order ID了,因為還沒有點保存,所以這只是一個臨時的ID。這時可以看到這幾個狀態就是生產訂單的初始狀態:
- REL:Released
- PRC: Pre-costed
- DISB: Distributed to MES
- MANC : Material availability not checked
- SETC Settlement rule created
點保存后,生成真實的ID,存儲到數據庫里。
要獲取更多Jerry的原創文章,請關注公眾號"汪子熙":
總結
以上是生活随笔為你收集整理的如何手动创建SAP S/4HANA的生产订单的全部內容,希望文章能夠幫你解決所遇到的問題。
- 上一篇: SAP Customer Data Cl
- 下一篇: 拼多多如何打开多多视频